Skip to main content

Aros Marine

Expedition ship “MS Fram”

Dedicated Sales Team

Our worldwide presence ensures the timeliness, cost efficiency compliance adherence required to ensure your vessel timelines are met.

SCOPE:

  • Public zones (Activity/ Science center, Explorer lounge, gym, sauna, and BBQ area.
  • 85 cabins & 20 suites

DURATION:

  • 1 month

WORKERS:

  • ~ 50

WORKS DONE:

  • Engineering & design works
  • Full dismounting works
  • Electrical works
  • Wall preparation and decorative top – covering
  • Floors (leveling, top covering, carpet replacements, vinyl installation, wooden floor vanishing)
  • Ceiling touch up works
  • Furniture (production & installation onboard)
  • BBQ area installation
  • Outdoor installation works

Other references